Underground Civil Works — Muar
Underground civil and HDD works along the Jalan Kampung Sri Manis to Jalan Pintasan Muar corridor
View ProjectSpecialist underground utility and HDD works delivered according to applicable safety standards and authority requirements.
We provide testing and commissioning services for underground power and fibre-optic infrastructure, including OTDR testing, optical power-meter testing, insulation-resistance testing, continuity testing, earth-resistance testing and applicable cable testing, with inspection records, as-built documentation and handover support.
Our team coordinates with clients, authorities and relevant parties to plan and execute works in accordance with project requirements and applicable standards.
Visual inspection and pre-commissioning verification before testing begins.
OTDR, power-meter, insulation-resistance, continuity and earth-resistance testing as applicable.
Staged inspection records and test results compiled for client and authority review.
As-built documentation prepared and handover support provided to the client.
Horizontal directional drilling for underground utility crossings
Controlled excavation and trenching for underground utility installation
Transport and deployment of HDD machinery and supporting equipment for project execution.
Underground civil and HDD works along the Jalan Kampung Sri Manis to Jalan Pintasan Muar corridor
View ProjectHDD and cabling works for 11kV aluminium XLPE underground cables, approximately 3 km
View ProjectOSP and ISP works for new-build fibre infrastructure, approximately 20.5 km
View ProjectOur work is planned and carried out according to applicable industry safety standards and the requirements of relevant authorities and regulatory bodies. Pre-work site surveys, risk assessments, toolbox meetings, appropriate PPE and staged inspections are standard practice on every project.
Our team will review your requirements and contact you regarding the project requirements.