11kV Underground Cable Installation — Perlis
HDD and cabling works for 11kV aluminium XLPE underground cables, approximately 3 km
View ProjectPower & Solar Infrastructure — Senawang, Malaysia
Trenching and cabling works for 11kV and 33kV infrastructure at a solar farm in Senawang.
Works were carried out according to applicable authority requirements and client standards.
Cable route survey, utility detection and route planning.
Controlled trenching, duct installation and supporting civil works.
Cable laying, pulling, jointing and termination for 11kV and 33kV infrastructure.
Testing, documentation and handover support.
Cover Image
Trenching and cabling works at a solar farm in Senawang
Cable handling works
Workers handling cable and conduit on the hillside at the solar farm site in Senawang, with solar panel mounting structures visible in the background.
Cable reels and trenching
Cable reels and trench excavation with CASE backhoe at the solar farm site.
Cable installation works
Workers guiding multiple cables into an open trench on the hillside, with solar panel structures visible above.
Trenching works
Workers managing cable bundles in a deep trench cut into the hillside at the solar farm.
Excavation works
Hitachi excavator (TMB-E10) working alongside personnel at the cable trench, with solar panel structures and forested hillside in the background.
HDD and cabling works for 11kV aluminium XLPE underground cables, approximately 3 km
View ProjectOSP and ISP works for new-build fibre infrastructure, covering approximately 20.5 km.
View ProjectUnderground civil and HDD works along the Jalan Kampung Sri Manis to Jalan Pintasan Muar corridor
View Project