11kV Underground Cable Installation — Perlis
HDD and cabling works for 11kV aluminium XLPE underground cables, approximately 3 km
View ProjectHDD & Civil Infrastructure — Johor, Malaysia
HDD works supporting the installation of decorative street-lighting infrastructure along the route from Taman Tun Aminah to Gelang Patah towards the stadium in Johor.
Works included HDD crossings and supporting civil works for the street-lighting corridor.
Works were carried out according to applicable authority requirements and client standards.
Site survey, utility detection and route preparation.
Horizontal directional drilling for underground crossings.
Supporting civil works and duct installation.
Backfilling, compaction and surface reinstatement.
Cover Image
Night HDD drilling works at Jalan Skudai–Gelang Patah, Johor Bahru
Night HDD drilling
Night HDD drilling works at Jalan Skudai–Gelang Patah, Johor Bahru (31 May 2024, 1:26 AM).
Duct staging
Red HDPE duct coils staged at Jalan Mutiara Utama, Mukim Pulai, Johor (29 May 2024).
Duct installation
Red duct emerging from night trench at Jalan Medan Nusa Perintis 7, Taman Nusa Perintis, Gelang Patah (31 May 2024, 11:53 PM).
Utility detection survey
GPR utility detection survey at Jalan Jaguh 1, 81300 Johor (7 June 2024, night works).
HDD and cabling works for 11kV aluminium XLPE underground cables, approximately 3 km
View ProjectOSP and ISP works for new-build fibre infrastructure, covering approximately 20.5 km.
View ProjectUnderground civil and HDD works along the Jalan Kampung Sri Manis to Jalan Pintasan Muar corridor
View Project