Fibre Infrastructure for Telecommunications Network

Fibre Infrastructure for Telecommunications Network

Telecommunications — Paloh, Johor, Malaysia

Project Overview

Survey, civil infrastructure, fibre-optic cabling and related implementation works for a telecommunications network, covering approximately 15 km.

The documented scope included HDD crossings, duct installation, fibre cable blowing, splicing, termination and OTDR testing.

Works were carried out to support national telecommunications infrastructure development requirements.

Our Approach

1

Route Survey

Network route survey, utility detection and civil preparation.

2

Duct Installation

HDD crossings, trenching and duct installation.

3

Fibre Installation

Fibre cable blowing, splicing and termination.

4

Testing & Handover

OTDR and power-meter testing, documentation and handover.

Cover Image

HDD rig with drill rod in trench at Paloh, Johor — fibre-network infrastructure works

HDD rig with drill rod in trench at Paloh, Johor — fibre-network infrastructure works

Telecommunications Network — Project Gallery

HDD rig with drill rod advancing through trench at Paloh, Johor (31 December 2024).

HDD rig operations

HDD rig with drill rod advancing through trench at Paloh, Johor (31 December 2024).

Excavator digging roadside trench at 48a Jalan Bandar, Paloh, Johor (31 December 2024).

Roadside excavation

Excavator digging roadside trench at 48a Jalan Bandar, Paloh, Johor (31 December 2024).

HDD rig with blue HDPE duct line at Jalan Tanpa Nama, Paloh, Johor (14 February 2025).

Duct installation

HDD rig with blue HDPE duct line at Jalan Tanpa Nama, Paloh, Johor (14 February 2025).

Cable sock and pulling head connected to blue HDPE duct at Jalan Tanpa Nama, Paloh, Johor (14 February 2025).

Cable pulling works

Cable sock and pulling head connected to blue HDPE duct at Jalan Tanpa Nama, Paloh, Johor (14 February 2025).

Site team briefing at Paloh, Johor (31 December 2024).

Site team

Site team briefing at Paloh, Johor (31 December 2024).

Additional Photographs — Project Association Pending Confirmation

HDD rig in roadside trench, Paloh, Johor (31 December 2024). GPS: 2°8'41.208"N 103°14'21.942"E.

Unverified — Photo A

HDD rig in roadside trench, Paloh, Johor (31 December 2024). GPS: 2°8'41.208"N 103°14'21.942"E.

Excavator digging roadside trench, 48a Jalan Bandar, Paloh, Johor (31 December 2024). GPS: 2°8'41.232"N 103°14'21.792"E.

Unverified — Photo B

Excavator digging roadside trench, 48a Jalan Bandar, Paloh, Johor (31 December 2024). GPS: 2°8'41.232"N 103°14'21.792"E.

HDD rig with blue HDPE line, Jalan Tanpa Nama, Paloh, Johor (14 February 2025). GPS: 2°9'43.203"N 103°14'53.276"E.

Unverified — Photo C

HDD rig with blue HDPE line, Jalan Tanpa Nama, Paloh, Johor (14 February 2025). GPS: 2°9'43.203"N 103°14'53.276"E.

View All Projects →
Underground cable installation works in PerlisPower & Solar2026

11kV Underground Cable Installation — Perlis

Perlis, Malaysia

HDD and cabling works for 11kV aluminium XLPE underground cables, approximately 3 km

View Project
HDD rig and drilling works at the Bandar Penawar fibre infrastructure siteTelecommunications2025

Fibre Infrastructure — Bandar Penawar

Bandar Penawar, Johor, Malaysia

OSP and ISP works for new-build fibre infrastructure, covering approximately 20.5 km.

View Project
HDD and underground civil works in MuarHDD & Civil2026

Underground Civil Works — Muar

Muar, Johor, Malaysia

Underground civil and HDD works along the Jalan Kampung Sri Manis to Jalan Pintasan Muar corridor